2.1 KiB
2.1 KiB
Tmux Detector Viability Verdict (tb-2ir)
Task
Record tmux detector viability verdict in decisions.md
What Was Done
Reviewed test results from child bead tb-1me and verified that the decision entry in docs/notes/decisions.md already contains comprehensive viability findings.
Entry Review
The existing "Tmux Detector Viability (2026-07-02)" section (lines 92-305) includes all required information:
✓ Verdict Stated Explicitly
VIABLE — Works as designed
✓ Quantitative Metrics
- False positive rate: Low (30s quiet threshold, prompt pattern matching, hash-based comparison)
- False negative rate: User-dependent (requires @tb- opt-in, non-standard prompts)
- Performance impact: Minimal (2s poll interval, <50ms per cycle for 10 panes, negligible CPU)
✓ Tuning Parameters Documented
| Parameter | Default | Configurable via |
|---|---|---|
| Quiet threshold | 30000ms (30s) | TRAILBOSS_QUIET_THRESHOLD_MS |
| Poll interval | 2000ms (2s) | TRAILBOSS_POLL_INTERVAL_MS |
| Opt-in prefix | @tb- |
TRAILBOSS_OPT_IN_PREFIX |
| Prompt patterns | 11 patterns | (code) |
✓ Test Results Included
- Test methodology documented
- Execution time metrics (55.2s avg duration, 0.84s std deviation)
- Accuracy analysis (100% detection accuracy, 0 false positives, 0 false negatives)
- Failure mode analysis (test infrastructure issue, not detector defect)
- Conclusions and recommendations
Changes Made
Added explicit reference to bead tb-1me in the test results section to link the decision to its source:
- Line 191: Added "Source: Bead
tb-1me— Tmux Detector Acceptance Test"
Conclusion
The tmux detector viability verdict is fully documented in docs/notes/decisions.md. The detector is production-ready with:
- Low false positive rate (mitigated by threshold and pattern matching)
- User-dependent false negative rate (acceptable for fallback)
- Minimal performance impact (negligible CPU overhead)
- Clear tuning parameters and production enablement instructions
Date: 2026-07-02 Parent bead: tb-2ir Child bead: tb-1me