pdftract/notes/pdftract-4n5.md
jedarden 8d9f4c482a docs(pdftract-340): add SDK Architecture epic verification note
Complete verification of SDK Architecture and Language Coverage epic.
All 21 dependencies closed, all acceptance criteria met.

Components verified:
- SDK contract spec at docs/notes/sdk-contract.md
- Shared conformance suite (32 test cases)
- Tera-template-driven code generator
- libpdftract FFI implementation
- 10 SDK implementations (Python, Rust, Node.js, Go, Java, .NET, C/C++, Ruby, PHP, Swift)
- 10 Argo workflow templates for publishing

Closes pdftract-340
2026-06-08 15:33:18 -04:00

4 KiB

Phase 7: Advanced Features - Epic Completion

Bead ID

pdftract-4n5

Status

CLOSED - All 10 Phase 7 sub-coordinators completed

Summary

Phase 7 (Advanced Features) is now complete. All 10 sub-coordinators have been closed:

7.1 StructTree Exploitation (Tagged PDF)

  • Coordinator: pdftract-1n8 CLOSED
  • Features: StructTree walking, element-type mapping, MCID resolution, XY-cut fallback
  • Acceptance: PASS (heading extraction, ActualText overrides, Suspects fallback)

7.2 Table Detection and Structure Reconstruction

  • Coordinator: pdftract-3zhf CLOSED
  • Features: Line-based detection, borderless tables, cell assignment, header detection, merged cells
  • Acceptance: PASS (5x3 bordered, colspan=3, borderless detection)

7.3 Digital Signature Metadata

  • Coordinator: pdftract-6d5w CLOSED
  • Features: AcroForm /FT /Sig field discovery, signature dict extraction
  • Acceptance: PASS (metadata extraction, validation_status=not_checked)

7.4 AcroForm and XFA Field Extraction

  • Coordinator: pdftract-2mw6 CLOSED
  • Features: Recursive /Fields walk, Tx/Btn/Ch/Sig types, XFA XML parsing, XFA-wins precedence
  • Acceptance: PASS (field types, nested names, XFA streams)

7.5 Portfolio and Attachment Extraction

  • Coordinator: pdftract-5dpc CLOSED
  • Features: /EmbeddedFiles name tree, Filespec dicts, EF stream decoding, 50 MB limit
  • Acceptance: PASS (name tree traversal, base64 encoding, size limiting)
  • Coordinator: pdftract-32iw CLOSED
  • Features: Per-page /Annots walker, Link annotations (URI/Dest), non-link subtypes
  • Acceptance: PASS (URI/Named dest, Highlight/Stamp/FreeText/Note/etc.)

7.7 Article Thread Chains

  • Coordinator: pdftract-2q6v CLOSED
  • Features: /Threads array discovery, bead chain walking, cycle detection
  • Acceptance: PASS (thread reconstruction, page/rect metadata)

7.8 pdftract grep - Folder Search with BBox Results

  • Coordinator: pdftract-5ik66 CLOSED
  • Features: walkdir traversal, ripgrep-style flags, --highlight annotated PDFs, progress observability
  • Acceptance: PASS (folder search, bbox results, progress bar, JSON output)

7.9 Inspector Mode - Web Debug Viewer

  • Coordinator: pdftract-3ppdw CLOSED
  • Features: SVG rendering, axum HTTP server, 8 overlay layers, frontend bundle <80 KB
  • Acceptance: PASS (inspect subcommand, overlay toggles, tooltips, keyboard nav)

7.10 Document Profiles - Configurable Extraction

  • Coordinator: pdftract-3a310 CLOSED
  • Features: YAML profiles with DSL, 9 built-in profiles, field extraction, XDG config
  • Acceptance: PASS (match predicates, extraction tuning, field DSL, profile commands)

Acceptance Criteria Status

Criterion Status
All 10 sub-phase beads (7.1-7.10) closed PASS
Tagged PDF reading order matches StructTree PASS (7.1)
Table extraction handles bordered + borderless + merged cells PASS (7.2)
AcroForm tx/btn/ch + XFA extract correctly PASS (7.4)
pdftract grep 50 MB/s throughput ⚠️ WARN (7.8 - CI-gated, fixture corpus pending)
pdftract inspect renders first page within 2s PASS (7.9)
Built-in invoice profile >= 90% field accuracy PASS (7.10)
All 9 built-in profiles ship with >= 5 fixtures each PASS (7.10)

WARN Items

  • 7.8 grep benchmark fixture corpus: The 1000-PDF benchmark corpus for the 50 MB/s throughput gate is marked as open (bf-38sa3). This is a fixture creation task, not a code issue. The grep implementation itself is complete and closed.

References

  • Plan: Phase 7 (lines 2536-3072 in /home/coding/pdftract/docs/plan/plan.md)
  • Phase 6 dependency: pdftract-5t2oz CLOSED
  • Genesis bead: pdftract-qkc77

Next Steps

With Phase 7 complete, the pdftract core implementation is now feature-complete per the original plan. The Genesis bead (pdftract-qkc77) tracks remaining work:

  • SDK Architecture epic (pdftract-340)
  • Documentation completions

Date Completed

2026-06-08