miroir-r3j.2
miroir-r3j.2: Verify SQLite backend tables 8-14 implementation
2026-05-20 07:23:32 -04:00
bf-1p4v.md
bf-1p4v: Verify compile error already fixed
2026-05-20 07:12:51 -04:00
bf-4w08.md
P6.10 Wire §14.8 resource-aware config defaults into Rust + values.yaml
2026-05-20 07:35:03 -04:00
bf-5r7p.md
miroir-zc2.5: Fix dump import compatibility matrix enhancement bead refs
2026-05-20 07:18:56 -04:00
bf-7r59.md
P6.9: Verify deployment sizing matrix doc (bf-7r59)
2026-05-20 06:50:43 -04:00
bf-55fg.md
bf-55fg: Add cross-reference comments to mode beads (miroir-m9q.3/4/5)
2026-05-20 07:13:23 -04:00
miroir-9dj.6.md
P2.6: Verify error mapping implementation already complete
2026-05-22 15:33:52 -04:00
miroir-9dj.7.md
P2.7: Add bearer-token dispatch implementation notes
2026-05-22 15:17:06 -04:00
miroir-9dj.8.md
P2.8: Verify middleware implementation acceptance criteria
2026-05-23 12:25:52 -04:00
miroir-46p.1.md
P10.1: Complete secret inventory + ESO ExternalSecret wiring
2026-05-23 07:30:43 -04:00
miroir-cdo.6-verification-2025-05-23.md
P1.6: Verification session - property tests and benchmarks already in place
2026-05-23 12:23:34 -04:00
miroir-cdo.6.md
P1.6: Verify property + benchmark tests for router
2026-05-23 12:42:50 -04:00
miroir-m9q.2-final-verification.md
P6.2: Final verification summary for peer discovery implementation
2026-05-23 02:56:17 -04:00
miroir-m9q.2-summary.md
P6.2: Peer discovery implementation verification summary
2026-05-23 02:59:02 -04:00
miroir-m9q.2-verification-summary.md
P6.2: Verify peer discovery implementation (plan §14.5)
2026-05-23 02:51:14 -04:00
miroir-m9q.2.md
P6.2: Peer discovery implementation verification notes
2026-05-23 02:42:42 -04:00
miroir-m9q.4.md
P6.4: Mode B leader-only singleton coordinator (plan §14.5)
2026-05-23 04:26:27 -04:00
miroir-m9q.5.md
P6.5: Add Mode C verification summary notes
2026-05-23 07:11:23 -04:00
miroir-mkk.1.md
P4.1: Rebalancer background worker - verification complete
2026-05-23 08:03:27 -04:00
miroir-mkk.2.md
P4.2: Verify node addition with dual-write + paginated migration
2026-05-23 08:21:00 -04:00
miroir-mkk.md
P4: Phase 4 topology operations verification — all chaos tests pass
2026-05-01 10:52:49 -04:00
miroir-qjt.2.md
P8.2: Document Helm chart structure completion
2026-05-23 07:18:55 -04:00
miroir-qjt.4.md
P8.4: Document miroir-ci.yaml Argo Workflows template completion
2026-05-23 07:26:55 -04:00
miroir-r3j-completion.md
Add Phase 3 completion note (miroir-r3j)
2026-05-03 20:51:41 -04:00
miroir-r3j-final-retrospective.md
P3: Add Phase 3 final retrospective and verification
2026-05-02 18:25:42 -04:00
miroir-r3j-final-verification.md
Phase 3: Final verification and completion note
2026-05-05 07:40:12 -04:00
miroir-r3j-phase3-completion-summary.md
P3: Complete Phase 3 — Task Registry + Persistence (SQLite + Redis)
2026-05-02 17:14:29 -04:00
miroir-r3j-phase3-completion.md
Phase 3: Verify Task Registry + Persistence completion
2026-05-03 15:33:34 -04:00
miroir-r3j-phase3-verification.md
Add Phase 3 verification summary (miroir-r3j)
2026-05-05 07:43:04 -04:00
miroir-r3j-phase3.md
P3: Add Phase 3 retrospective and verification notes
2026-05-03 08:30:38 -04:00
miroir-r3j-retrospective.md
Add Phase 3 retrospective (miroir-r3j)
2026-05-05 07:43:51 -04:00
miroir-r3j-verification-session.md
P3: Add verification session notes for bead closure
2026-05-02 18:04:34 -04:00
miroir-r3j-verification-summary.md
P3: Verify Phase 3 Task Registry + Persistence completion
2026-05-02 17:15:58 -04:00
miroir-r3j-verification.md
P3: Add Phase 3 verification summary and close bead
2026-05-03 08:30:38 -04:00
miroir-r3j.1.md
P3.1 TaskStore trait + SQLite backend verification
2026-05-20 06:44:55 -04:00
miroir-r3j.2.md
miroir-r3j.2: Verify SQLite backend tables 8-14 implementation
2026-05-20 07:20:30 -04:00
miroir-r3j.3.md
miroir-r3j.3: Verify Redis backend TaskStore implementation (plan §4)
2026-05-20 07:27:46 -04:00
miroir-r3j.4.md
miroir-r3j.4: Verify P3.4 schema versioning implementation
2026-05-20 07:35:14 -04:00
miroir-r3j.6.md
miroir-r3j.6: Verify task registry TTL pruner implementation
2026-05-20 07:16:06 -04:00
miroir-r3j.md
P3: Add Phase 3 completion verification summary
2026-05-03 08:36:30 -04:00
miroir-uhj-phase5-verification.md
Phase 5: Update verification document - all 21 capabilities complete
2026-05-03 20:42:41 -04:00
miroir-uhj.5-completion.md
P5.5 §13.5: Complete two-phase settings broadcast + drift reconciler
2026-05-22 22:03:01 -04:00
miroir-uhj.5.1.md
P5.5.a: Propose Phase 1 parallel PATCH + task succession
2026-05-23 07:34:52 -04:00
miroir-uhj.5.2.md
P5.5.b: Update notes with parallel verify phase details
2026-05-23 08:00:17 -04:00
miroir-uhj.5.3.md
P5.5.c: Document commit phase implementation
2026-05-23 08:04:24 -04:00
miroir-uhj.5.md
P5.5 §13.5 Two-phase settings broadcast + drift reconciler (OP#4)
2026-05-22 15:39:26 -04:00
miroir-uhj.7.md
P5.7 §13.7: Add verification notes for atomic index aliases
2026-05-23 02:13:45 -04:00
miroir-uhj.8.1.md
Add retrospective to P5.8.a notes
2026-05-23 08:14:23 -04:00
miroir-uhj.8.2.md
P5.8.b: Verify bucket-granular re-digest implementation
2026-05-23 08:56:43 -04:00
miroir-uhj.8.md
P5.8 §13.8 Anti-entropy shard reconciler - Verification complete
2026-05-23 12:34:22 -04:00
miroir-uhj.13.6.md
P5.13.f: Verify CDC event suppression by _miroir_origin tag
2026-05-23 08:34:10 -04:00
miroir-uhj.14.md
P5.14 §13.14: Document and verify TTL + automatic expiration
2026-05-23 09:39:53 -04:00
miroir-zc2.1.md
miroir-zc2.1: Verify cutover race window analysis (P12.OP1)
2026-05-20 07:29:59 -04:00
miroir-zc2.3.md
miroir-zc2.3: Validate 2× transient load caveat for online resharding (P12.OP3)
2026-05-20 07:24:22 -04:00
miroir-zc2.4.md
miroir-zc2.4: Verify score normalization at scale (note-of-no-action)
2026-05-20 07:12:51 -04:00
miroir-zc2.5.md
miroir-zc2.5: Fix dump import compatibility matrix enhancement bead refs
2026-05-20 07:16:06 -04:00