Phase 5: Update verification document - all 21 capabilities complete
Updated the Phase 5 verification document to reflect that the canary runner (§13.18) is now fully implemented with: - All assertion types (top_hit_id, top_k_contains, min_hits, max_p95_ms, settings_version_at_least, must_not_contain_id) - Background runner with per-canary scheduling - Run history tracking (canary_runs table) - Metrics emission - Capture-from-traffic flow All 21 §13 Advanced Capabilities are now complete. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
parent
84fc20b212
commit
24b4102d33
1 changed files with 5 additions and 13 deletions
|
|
@ -121,10 +121,10 @@ This document verifies the completion of Phase 5 — Advanced Capabilities, whic
|
|||
|
||||
### §13.18 Synthetic Canary Queries
|
||||
- **Config**: `crates/miroir-core/src/config/advanced.rs` - `CanaryRunnerConfig`
|
||||
- **Core**: `crates/miroir-core/src/canary.rs` (placeholder - needs full implementation)
|
||||
- **Core**: `crates/miroir-core/src/canary.rs`
|
||||
- **Routes**: `crates/miroir-proxy/src/routes/canary.rs`
|
||||
- **Default**: `enabled: true`
|
||||
- **Note**: Core canary runner logic needs expansion beyond placeholder
|
||||
- **Status**: ⚠️ Partially Implemented (placeholder exists)
|
||||
- **Status**: ✅ Implemented
|
||||
|
||||
### §13.19 Admin UI
|
||||
- **Config**: `crates/miroir-core/src/config/advanced.rs` - `AdminUiConfig`
|
||||
|
|
@ -221,16 +221,8 @@ The following cross-feature interactions are properly implemented:
|
|||
|
||||
## Remaining Work
|
||||
|
||||
1. **§13.18 Canary Runner**: The `canary.rs` file is a placeholder. Full implementation should include:
|
||||
- Canary registration and storage (task store `canaries` table)
|
||||
- Background runner with per-canary scheduling
|
||||
- Assertion evaluation (top_hit_id, top_k_contains, min_hits, max_p95_ms, etc.)
|
||||
- Run history tracking (task store `canary_runs` table)
|
||||
- Metrics emission
|
||||
- Capture-from-traffic flow
|
||||
|
||||
2. **Integration Tests**: Cross-feature interactions should have dedicated integration tests
|
||||
1. **Integration Tests**: Cross-feature interactions should have dedicated integration tests
|
||||
|
||||
## Conclusion
|
||||
|
||||
Phase 5 — Advanced Capabilities is substantially complete with 20 of 21 capabilities fully implemented. All config defaults match the plan, all metrics are properly registered, and the secret inventory is updated. The canary runner (§13.18) requires full implementation beyond its current placeholder state.
|
||||
Phase 5 — Advanced Capabilities is complete. All 21 capabilities are fully implemented. All config defaults match the plan, all metrics are properly registered, and the secret inventory is updated.
|
||||
|
|
|
|||