bf-1vd: Update plan.md — mark completed phases, document gaps
Summary
This bead requested updating docs/plan/plan.md to:
- Change all
- [ ]items in Phases 1–11 to- [x] - Add a
## Statussection documenting in-progress and pending items - Note the Phase 11 WorkflowTemplate ArgoCD sync status and deferred install.sh test
Finding
All requested changes were already committed in 4b2161c ("docs(plan): mark phases
1-11 complete, add Status section"). The plan.md currently shows:
- All phase checkboxes in Phases 1–11 are
- [x] - Status section present at the top of Implementation Phases:
- Phases 1–11 module implementation: COMPLETE
main()session orchestration: IN PROGRESS (bf-40i)- Binary-level E2E tests (AS-1, AS-2, AS-5): IN PROGRESS (bf-52c)
- AS-4 billing classification: PENDING manual verification
- CI release binary: PENDING (WorkflowTemplate synced, no release tag yet)
- Phase 11 entry notes the deferred install.sh end-to-end download test
No code changes were required — work was already complete.