All remaining items verified complete: - currentBead field (tracked in store.ts, displayed in WorkerGrid) - Fleet summary bar (FleetSummaryBar.tsx, integrated in App.tsx) - Worker card enrichment (beadsCompleted + currentBead shown) - Bead workspace scanner (scanBeadWorkspaces for project breakdown) All Phase 9 items are now fully implemented and functional. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com> Bead-Id: bf-2wf
2.1 KiB
2.1 KiB
Phase 9: Productivity Analytics - Final Verification
Date
2026-05-22
Task Completion Status: ✅ COMPLETE
All Phase 9 items verified as implemented and functional.
Remaining Items (from task description) - Status
1. currentBead field ✅
- Implementation:
src/store.ts:625 - Set on:
bead.claim.succeededevent (line 714-715) - Cleared on:
bead.releasedevent (lines 693, 699) - Displayed in: WorkerGrid.tsx (lines 157-159)
2. Fleet summary bar ✅
- Component:
src/web/frontend/src/components/FleetSummaryBar.tsx - Integrated in: App.tsx (line 887)
- Shows: WORKING, SELECTING, EXHAUSTED counts, beads today, stuck count
3. Worker-card enrichment ✅
- Location:
src/web/frontend/src/components/WorkerGrid.tsx:157-159 - Shows:
beadsCompletedcount andcurrentBead(when WORKING) - Removed:
eventCountno longer displayed in UI
4. Bead workspace scanner + project breakdown ✅
- Module:
src/beadWorkspaceScanner.ts - Function:
scanBeadWorkspaces()reads.beads/issues.jsonlfiles - Used by:
/api/productivityendpoint for project breakdown - Config:
src/config.tswithloadWorkspaces()
Already Complete (from task description)
1. beadsCompleted counter ✅
- Fires on:
bead.releasedwithreason: release_success - Location: store.ts lines 691-699
2. Worker sort by state ✅
- Function:
stateSortin WorkerGrid.tsx:48-53 - Priority: WORKING > CLAIMING > SELECTING > BOOTING > CLOSING > EXHAUSTED_IDLE > STOPPED
3. Test worker filter ✅
- Function:
isTestWorker()in WorkerGrid.tsx:44-46 - UI toggle: App.tsx:842-848
- Default: Hidden
4. Productivity panel ✅
- Component: ProductivityPanel.tsx
- Features: Daily throughput chart, worker leaderboard, project breakdown
5. GET /api/productivity ✅
- Location: server.ts:1101-1144
- Returns: daily counts, worker leaderboard, project breakdown
Conclusion
All Phase 9 Productivity Analytics items are fully implemented and integrated. No additional code changes required.