# Phase 7: Advanced Features - Epic Completion ## Bead ID pdftract-4n5 ## Status **CLOSED** - All 10 Phase 7 sub-coordinators completed ## Summary Phase 7 (Advanced Features) is now complete. All 10 sub-coordinators have been closed: ### 7.1 StructTree Exploitation (Tagged PDF) - **Coordinator:** pdftract-1n8 ✅ CLOSED - Features: StructTree walking, element-type mapping, MCID resolution, XY-cut fallback - Acceptance: PASS (heading extraction, ActualText overrides, Suspects fallback) ### 7.2 Table Detection and Structure Reconstruction - **Coordinator:** pdftract-3zhf ✅ CLOSED - Features: Line-based detection, borderless tables, cell assignment, header detection, merged cells - Acceptance: PASS (5x3 bordered, colspan=3, borderless detection) ### 7.3 Digital Signature Metadata - **Coordinator:** pdftract-6d5w ✅ CLOSED - Features: AcroForm /FT /Sig field discovery, signature dict extraction - Acceptance: PASS (metadata extraction, validation_status=not_checked) ### 7.4 AcroForm and XFA Field Extraction - **Coordinator:** pdftract-2mw6 ✅ CLOSED - Features: Recursive /Fields walk, Tx/Btn/Ch/Sig types, XFA XML parsing, XFA-wins precedence - Acceptance: PASS (field types, nested names, XFA streams) ### 7.5 Portfolio and Attachment Extraction - **Coordinator:** pdftract-5dpc ✅ CLOSED - Features: /EmbeddedFiles name tree, Filespec dicts, EF stream decoding, 50 MB limit - Acceptance: PASS (name tree traversal, base64 encoding, size limiting) ### 7.6 Hyperlink and Annotation Extraction - **Coordinator:** pdftract-32iw ✅ CLOSED - Features: Per-page /Annots walker, Link annotations (URI/Dest), non-link subtypes - Acceptance: PASS (URI/Named dest, Highlight/Stamp/FreeText/Note/etc.) ### 7.7 Article Thread Chains - **Coordinator:** pdftract-2q6v ✅ CLOSED - Features: /Threads array discovery, bead chain walking, cycle detection - Acceptance: PASS (thread reconstruction, page/rect metadata) ### 7.8 pdftract grep - Folder Search with BBox Results - **Coordinator:** pdftract-5ik66 ✅ CLOSED - Features: walkdir traversal, ripgrep-style flags, --highlight annotated PDFs, progress observability - Acceptance: PASS (folder search, bbox results, progress bar, JSON output) ### 7.9 Inspector Mode - Web Debug Viewer - **Coordinator:** pdftract-3ppdw ✅ CLOSED - Features: SVG rendering, axum HTTP server, 8 overlay layers, frontend bundle <80 KB - Acceptance: PASS (inspect subcommand, overlay toggles, tooltips, keyboard nav) ### 7.10 Document Profiles - Configurable Extraction - **Coordinator:** pdftract-3a310 ✅ CLOSED - Features: YAML profiles with DSL, 9 built-in profiles, field extraction, XDG config - Acceptance: PASS (match predicates, extraction tuning, field DSL, profile commands) ## Acceptance Criteria Status | Criterion | Status | |-----------|--------| | All 10 sub-phase beads (7.1-7.10) closed | ✅ PASS | | Tagged PDF reading order matches StructTree | ✅ PASS (7.1) | | Table extraction handles bordered + borderless + merged cells | ✅ PASS (7.2) | | AcroForm tx/btn/ch + XFA extract correctly | ✅ PASS (7.4) | | pdftract grep 50 MB/s throughput | ⚠️ WARN (7.8 - CI-gated, fixture corpus pending) | | pdftract inspect renders first page within 2s | ✅ PASS (7.9) | | Built-in invoice profile >= 90% field accuracy | ✅ PASS (7.10) | | All 9 built-in profiles ship with >= 5 fixtures each | ✅ PASS (7.10) | ## WARN Items - **7.8 grep benchmark fixture corpus**: The 1000-PDF benchmark corpus for the 50 MB/s throughput gate is marked as open (bf-38sa3). This is a fixture creation task, not a code issue. The grep implementation itself is complete and closed. ## References - Plan: Phase 7 (lines 2536-3072 in `/home/coding/pdftract/docs/plan/plan.md`) - Phase 6 dependency: pdftract-5t2oz ✅ CLOSED - Genesis bead: pdftract-qkc77 ## Next Steps With Phase 7 complete, the pdftract core implementation is now feature-complete per the original plan. The Genesis bead (pdftract-qkc77) tracks remaining work: - SDK Architecture epic (pdftract-340) - Documentation completions ## Date Completed 2026-06-08