Commit graph

1 commit

Author SHA1 Message Date
jedarden
9d50148fa0 docs(pdftract-5kqs1): add Phase 5 OCR Integration verification note
Add comprehensive verification note documenting Phase 5 implementation status:
- All 6 sub-phases have production-ready infrastructure
- Page Classification complete (97 tests, verified via pdftract-400)
- Image Extraction complete (two-tier architecture, pdfium-render)
- Image Preprocessing complete (1,931 lines across 5 modules)
- Tesseract Integration complete (3,100+ lines, HOCR, WER calculation)
- Assisted OCR complete (position validation, confidence capping)
- Document Type Classification infrastructure complete (9 built-in profiles)

Blockers documented:
- System dependencies (tesseract, leptonica) prevent CI test execution
- CI infrastructure not yet set up
- Phase 5.6 final integration deferred (requires extraction pipeline changes)
- Labeled corpus creation needed for classifier accuracy validation

All code infrastructure acceptance criteria: PASS
CI-gated acceptance criteria: DEFERRED (infrastructure)

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-08 13:32:18 -04:00