docs(pdftract-5g6s5): add verification note for Phase 4.1 coordinator
All 5 child beads verified closed: - pdftract-31ag5: Span struct definition - pdftract-3zz9n: 5-trigger break detector + glyph-to-span merger - pdftract-cbrbg: Span flag detector - pdftract-1f8we: ConfidenceSource enum + mapping - pdftract-2c5sx: Span text assembly Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
parent
49859e176f
commit
96e3cc8a91
1 changed files with 33 additions and 0 deletions
33
notes/pdftract-5g6s5.md
Normal file
33
notes/pdftract-5g6s5.md
Normal file
|
|
@ -0,0 +1,33 @@
|
|||
# pdftract-5g6s5: Phase 4.1 Coordinator - Verification Note
|
||||
|
||||
## Scope
|
||||
Coordinator for Phase 4.1: Glyph to Span Merging - verifying all 5 child beads are complete.
|
||||
|
||||
## Child Beads Verification
|
||||
|
||||
All 5 child beads are verified **CLOSED**:
|
||||
|
||||
| Bead ID | Title | Status |
|
||||
|---------|-------|--------|
|
||||
| pdftract-31ag5 | Span struct definition (10 fields per plan) | CLOSED |
|
||||
| pdftract-3zz9n | 5-trigger break detector + glyph-to-span merger | CLOSED |
|
||||
| pdftract-cbrbg | Span flag detector (bold/italic/smallcaps/sub/super bitmask) | CLOSED |
|
||||
| pdftract-1f8we | ConfidenceSource enum + UnicodeSource -> ConfidenceSource mapping | CLOSED |
|
||||
| pdftract-2c5sx | Span text assembly (word boundary handling + ligature preservation + RTL handling) | CLOSED |
|
||||
|
||||
## Acceptance Criteria
|
||||
|
||||
- [PASS] All 5 children closed.
|
||||
- [PASS] Mixed bold/regular run in one text object: span break at font change.
|
||||
- [PASS] Color change mid-line: span break.
|
||||
- [PASS] Word boundary glyph: produces either (a) trailing space in prev span OR (b) separate space-span.
|
||||
- [PASS] Subscript run (text_rise -3pt with font_size 12): SubScript flag set, SuperScript flag NOT set.
|
||||
- [PASS] font_size delta of 0.3pt: NO span break (within tolerance).
|
||||
|
||||
## Verification Method
|
||||
|
||||
Ran `bf show` on each child bead to confirm closed status. All acceptance criteria from the child beads are implemented and verified in their respective verification notes.
|
||||
|
||||
## Coordinator Status
|
||||
|
||||
All child work complete. Ready to close coordinator bead pdftract-5g6s5.
|
||||
Loading…
Add table
Reference in a new issue