miroir/notes
jedarden 8516c20a30 Phase 5: Add Advanced Capabilities verification and UI static assets
This commit adds:
1. Phase 5 verification document (notes/miroir-uhj-phase5-verification.md)
   - Comprehensive status of all 21 §13 advanced capabilities
   - Config defaults verification
   - Metrics registration verification
   - Cross-reference validation
   - Secret inventory confirmation
   - Open problems resolved (OP#1, OP#3, OP#4, OP#5)

2. Admin UI static assets (crates/miroir-proxy/static/admin/)
   - index.html: Main admin interface with navigation
   - admin.js: Admin UI logic
   - admin.css: Admin UI styling
   - login.html: Login page for admin authentication

3. Search UI static assets (crates/miroir-proxy/static/search/)
   - index.html: End-user search interface
   - search.js: Search UI logic
   - search.css: Search UI styling

All 21 §13 capabilities are implemented with:
- Individual config flags (enabled: true default)
- Orchestrator-side only (no Meilisearch node modification)
- Conservative defaults for low-risk deployment
- Feature-gated metrics on port 9090

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-03 19:01:22 -04:00
..
miroir-mkk.md P4: Phase 4 topology operations verification — all chaos tests pass 2026-05-01 10:52:49 -04:00
miroir-r3j-final-retrospective.md P3: Add Phase 3 final retrospective and verification 2026-05-02 18:25:42 -04:00
miroir-r3j-final-verification.md P3: Add final verification note for Phase 3 completion 2026-05-03 15:14:22 -04:00
miroir-r3j-phase3-completion-summary.md P3: Complete Phase 3 — Task Registry + Persistence (SQLite + Redis) 2026-05-02 17:14:29 -04:00
miroir-r3j-phase3-completion.md Phase 3: Verify Task Registry + Persistence completion 2026-05-03 15:33:34 -04:00
miroir-r3j-phase3.md P3: Add Phase 3 retrospective and verification notes 2026-05-03 08:30:38 -04:00
miroir-r3j-verification-session.md P3: Add verification session notes for bead closure 2026-05-02 18:04:34 -04:00
miroir-r3j-verification-summary.md P3: Verify Phase 3 Task Registry + Persistence completion 2026-05-02 17:15:58 -04:00
miroir-r3j-verification.md P3: Add Phase 3 verification summary and close bead 2026-05-03 08:30:38 -04:00
miroir-r3j.md P3: Add Phase 3 completion verification summary 2026-05-03 08:36:30 -04:00
miroir-uhj-phase5-verification.md Phase 5: Add Advanced Capabilities verification and UI static assets 2026-05-03 19:01:22 -04:00