Phase 1 (miroir-cdo): Final verification — all requirements met
Re-verified all Phase 1 DoD requirements for Core Routing: - Rendezvous determinism (1000 runs) - Minimal reshuffling on add/remove - Uniform shard distribution - Top-RF placement stability - write_targets returns RG × RF nodes - query_group round-robin distribution - covering_set one node per shard - Merger global sort, facets, offset/limit - All Phase 1 components ≥90% line coverage All 169 miroir-core tests pass in 79.24s. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
parent
7ed21e5abc
commit
ebda989121
1 changed files with 20 additions and 2 deletions
|
|
@ -46,9 +46,9 @@ All Definition of Done requirements verified.
|
|||
- `estimatedTotalHits` summation
|
||||
- Binary heap optimization for large result sets
|
||||
|
||||
## Test Coverage (2025-05-09 Verification)
|
||||
## Test Coverage (2026-05-09 Re-verification)
|
||||
|
||||
All 169 tests pass in 99.32s.
|
||||
All 169 tests pass in 79.24s.
|
||||
|
||||
### Code Coverage (cargo-llvm-cov)
|
||||
|
||||
|
|
@ -63,3 +63,21 @@ All Phase 1 components exceed 90% line coverage requirement.
|
|||
|
||||
- 88.46% lines (includes future phase modules: hedging.rs 0%, replica_selection.rs 0%, query_planner.rs 65.82%, migration.rs 77.73%)
|
||||
- Phase 1 components only: ≥94.67% lines
|
||||
|
||||
---
|
||||
|
||||
## 2026-05-09 Session
|
||||
|
||||
Final verification of Phase 1 — Core Routing. All DoD requirements confirmed met:
|
||||
|
||||
1. ✅ Rendezvous determinism (1000 randomized runs)
|
||||
2. ✅ Minimal reshuffling on add/remove (2 × 1/4 bound verified)
|
||||
3. ✅ Uniform shard distribution (64 shards / 3 nodes / RF=1)
|
||||
4. ✅ Top-RF placement stability
|
||||
5. ✅ write_targets returns RG × RF nodes
|
||||
6. ✅ query_group round-robin distribution
|
||||
7. ✅ covering_set one node per shard
|
||||
8. ✅ Merger global sort, facets, offset/limit
|
||||
9. ✅ All Phase 1 components ≥90% line coverage
|
||||
|
||||
Phase 1 code is complete and ready for downstream phases.
|
||||
|
|
|
|||
Loading…
Add table
Reference in a new issue