Drop-in replacement for claude -p that drives the interactive TUI via PTY, preserving subscription billing
Find a file
jedarden 4cf7acb8f8 Close bead bf-2f1: Phase 8 Emitter verification complete
All 13 emitter unit tests pass. Phase 8 implementation verified:
text/json/stream-json output formats, error result objects, exit
code mapping, and stream-json reader thread all confirmed correct.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-10 01:18:12 -04:00
.beads Update beads tracking for bf-2f1 (Phase 8 Emitter verification) 2026-06-10 01:16:09 -04:00
docs gap-review round 10: 3 gaps fixed 2026-06-07 14:24:50 -04:00
notes Close bead bf-2f1: Phase 8 Emitter verification complete 2026-06-10 01:18:12 -04:00
src Add Phase 8: Emitter — text/json/stream-json output formats 2026-06-10 00:57:30 -04:00
test-fixtures/mock-claude Implement Phase 6: Stop Poller (bf-64s) 2026-06-10 00:05:14 -04:00
tests Add Phase 8: Emitter — text/json/stream-json output formats 2026-06-10 00:57:30 -04:00
Cargo.lock Add mock-claude fixture, test_pty_spawns_tty integration test, and hook module export 2026-06-08 08:56:36 -04:00
Cargo.toml Phase 2: implement PTY open and fork in pty.rs 2026-06-07 16:38:14 -04:00
README.md Remove prior art references; expand plan to full feature set and test coverage 2026-06-07 10:35:10 -04:00

claude-print

Drop-in replacement for claude -p (print/headless mode) that drives the Claude Code interactive TUI via PTY — preserving subscription billing after the June 15, 2026 Agent SDK credit split.

Why this exists

Starting June 15, 2026, Anthropic separates claude -p (headless) into a separate Agent SDK credit pool ($100$200/month on Max plans). Only the interactive TUI (cc_entrypoint=cli) continues drawing from the unlimited subscription. claude-print wraps the interactive TUI in a PTY so callers get claude -p wire-compatible output while billing against the subscription.

Structure

  • docs/notes/ — design decisions, constraints, integration details
  • docs/plan/plan.md — complete implementation plan