diff --git a/notes/bf-4lwr.md b/notes/bf-4lwr.md index ec6289c..c9896bd 100644 --- a/notes/bf-4lwr.md +++ b/notes/bf-4lwr.md @@ -1,38 +1,26 @@ -# Task bf-4lwr: Status table verification +# bf-4lwr: Status table verification for v0.2.0 -## Task -Update Status table in `docs/plan/plan.md` to reflect v0.2.0 release state. +## Date: 2026-07-02 -## Verification performed +## Verification Result -1. **Current Status table state (line 952-960):** - - Phases 1–11 module implementation: **COMPLETE** - - `main()` session orchestration: **COMPLETE** — shipped as v0.2.0 - - Binary-level E2E tests (AS-1, AS-2, AS-5): **COMPLETE** — tests passing (bf-46x) - - AS-4 billing classification: **PENDING** - - CI release binary: **PENDING** +The Status table in `docs/plan/plan.md` already reflects the v0.2.0 reality correctly: -2. **Bead reference validation:** - - `bf-46x` exists (status: open, type: task, priority: P1) - - `bf-40i` does not exist (likely deleted) - - `bf-52c` does not exist (likely deleted) +- **Phases 1–11 module implementation**: COMPLETE +- **main() session orchestration**: COMPLETE — references v0.2.0, no bf-40i reference +- **Binary-level E2E tests (AS-1, AS-2, AS-5)**: COMPLETE — references bf-46x (bf-52c removed) +- **AS-4 billing classification**: PENDING (manual verification) +- **CI release binary**: PENDING (awaiting tag) -3. **Test verification:** - - Integration tests pass: 28 passed, 0 failed - - Binary E2E scenarios covered in `tests/integration/scenarios.rs` +## Bead ID Validation -## Acceptance criteria -- ✓ Status table reflects v0.2.0 reality -- ✓ No references to deleted beads bf-40i/bf-52c -- ✓ All referenced bead IDs are valid (bf-46x exists) +Verified that all referenced bead IDs exist: +- `bf-46x`: EXISTS (Binary-level E2E tests) + +No references to deleted beads found: +- `bf-40i`: NOT referenced (removed in v0.2.0) +- `bf-52c`: NOT referenced (deleted) ## Conclusion -The Status table was already correctly updated prior to this task. No changes to `docs/plan/plan.md` were needed. The table accurately reflects that v0.2.0 shipped with: -- Complete module implementation (Phases 1–11) -- Complete `main()` session orchestration -- Complete binary-level E2E tests (AS-1, AS-2, AS-5) -- Pending manual AS-4 billing verification -- Pending CI release tag -## Date -2026-07-02 +The Status table is accurate and up-to-date. No changes were required.