All implementation gaps from Phases 1-8 are closed (2418 tests passing). Phase 9 planning added to docs/plan.md with productivity analytics design. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> Bead-Id: bf-48nk |
||
|---|---|---|
| .. | ||
| cli.md | ||
| FileHeatmap-Integration.md | ||
| gap-analysis.md | ||
| memory-audit-bd-ch6.7.md | ||
| metrics.md | ||
| needle-exporter-wiring.md | ||
| plan.md | ||
| schema.md | ||